A drum sieve with a shredder that replaced a clogging vibrating sieve in a pepper line

A US food processor ran peppers over an old vibrating sieve that no longer did the job: the product stuck and stopped flowing, the screen clogged, and the separation was poor. We designed a drum sieve with a shredder to replace it, with a new frame and new inlet and outlet chutes, fitted to the old sieve's place and connections in the existing line.

Industry
Food processing
Region
United States
Service
Plant engineering
Illustrations.
replacement in the old sieve's place and connections
1:1
replacement in the old sieve's place and connections
with cage and mesh, instead of a flat vibrating screen
Drum
with cage and mesh, instead of a flat vibrating screen
new chutes, inlet and outlet, to the existing line
2
new chutes, inlet and outlet, to the existing line
drawing package: assemblies, weldments, parts and BOM
Full
drawing package: assemblies, weldments, parts and BOM
The challenge

What had to be solved

  • The product stuck on the old vibrating sieve and stopped flowing.
  • The screen clogged, so the line had to stop for cleaning.
  • Separation was poor, and the new machine had to fit the old sieve's place and connections.
The result

What the client has now

  • A drum sieve with a shredder, designed to take the old vibrating sieve's place in the line.
  • A design that keeps the product moving, where the flat screen let it stick and clog.
  • A full drawing package for the workshop: assemblies, weldments, parts and BOM.
What we did

How we approached it

  1. 01

    Drum instead of a flat screen

    A rotating drum with a cage and mesh keeps the product moving over the mesh instead of letting it pile up on a flat screen.

  2. 02

    Shredder built in

    A shredder was built into the design, so the line gets one machine instead of two.

  3. 03

    Frame, drive and supports

    A new frame, with the drive and the support components selected for the drum.

  4. 04

    Chutes to the existing line

    Inlet and outlet chutes designed to the existing connections, in the space the old sieve left.

Images

The work, step by step

Drum sieve with shredder in the old sieve's place
Drum sieve, general assembly
BOM excerpt of the drum sieve

Illustrations. Click an image to enlarge it.

Deliverables

What was handed over

  • 3D design of the drum sieve with the shredder
  • Frame, drive and support components
  • Inlet and outlet chutes for the existing line
  • Full drawing package with BOM
Tools
  • Autodesk Inventor

This project is part of our plant engineering work.

Talk to the engineer, not a sales rep

Send us one area of your plant.

Tell us what has to change and what scan data you have. In 20 minutes you will know what the model and the design would take.

Blagoj Bejkov
Blagoj Bejkov
Founder and lead engineer
Replies within one business day